Rugeley Power Station
You are here: Rugeley Power Station
  • Name: Rugeley Power Station
  • Category: Deommissioning
  • Client: GDF Suez Energy UK Europe
  • Description:
Appointed as Principal Contractor by this internationally renowned client we were responsible for the decommissioning and demolition of a tank farm and the associated buildings at Rugeley Power Station based in Stafford.

The scope of works included the expeditious removal of the remaining tank contents together with vessel cleaning prior to the decommissioning of the tank farm and pipeline network.

Further phases of the works included the soft stripping of the associated buildings and subsequent demolition of the structures to slab level, grubbing up and removal of foundations and service ducts, the demolition of the tanks, concrete plinths and bund walls and the backfilling of site voids. All concrete and brick demolition arisings were stockpiled on site and later crushed to 6F2 capping grade for re-use elsewhere at the facility.